Skip to main content
. 2022 May 26;19(11):6490. doi: 10.3390/ijerph19116490
AC average cost
BTU British thermal unit
CCS carbon capture and storage
CCSFCM carbon capture and storage facility case model
CO2 carbon dioxide
COE cost of electricity
CSM case study models
FS feasibility study
GO gas oil
HO heavy oil
IRR internal rate of return
Kwh kilowatt per hour
LAC lowest average cost (USD)
LCOE levelized cost of electricity (USD/MW)
Mtpa million tons per annum
MW megawatt
NPV net present value (USD)
OCFIX first-year operating costs (USD)
OCVAR first-year variable operating costs (USD)
PBP payback period (year)
PSCM power station case model
PSIC power station installed capacity (MW)
SAMLCAT statistical average method on the low-cost accounting technique
TC total cost (million USD)
TOC first-year capital costs (charges) (USD)