Detailed analysis of the risk factors associated with the procedure in terms of the complexity of the procedure and major complications.

System and procedure information Implantation ages 19–29 Implantation and TLE ages 40–80 A vs. B
A B Mann–Whitney U test, Chi2
P
Number of patients 126 2659
Data for analysis Count/average %/SD Count/average %/SD
Potential risk factors for major complications and technical problems
Number of extracted leads per patient 1.74 0.87 1.67 0.77 P = 0.384
Need to use alternative approach 5 3.97% 84 3.16% P = 0.806
Extraction of VDD lead 13 10.32% 64 2.41% P < 0.001
Extraction of lead with too long loop 7 5.56% 94 3.54% P = 0.387
Extraction of broken lead with too long loop 2 1.50% 67 0.00% P = 0.715
Extraction of abandoned lead(s) (any) 17 13.49% 288 10.83% P = 0.043
HV therapy (ICD) lead was extracted 38 30.16% 788 29.64% P = 0.979
CS (LV pacing) lead was extracted 0 0.00% 185 6.96% P = 0.004
Cumulative dwell times of extracted leads (in years) 22.60 16.90 13.16 12.57 P < 0.001
SAFETY TLE risk score (number of points) 8.70 5.00 5.65 4.21 P < 0.001
TLE procedure duration
Procedure duration (skin to skin) (minutes) 66.90 35.46 60.18 25.87 P = 0.013
Procedure duration (sheath to sheath) (minutes) 22.27 32.77 14.81 22.75 P < 0.001
Mean extraction time per lead (sheath-to sheath/number of extracted leads) (minutes) 14.10 26.60 8.65 12.24 P < 0.001
Procedure difficulty
Technical problem during TLE (any) 43 34.13% 521 19.59% P < 0.001
Lead-to-lead binding 12 9.52% 181 6.81% P = 0.320
Byrd dilator collapse/torsion/"fracture" 14 11.11% 77 2.90% P < 0.001
Extracted lead fracture/rupture during extraction 18 14.29% 150 5.64% P < 0.001
Loss of free lead fragment 1 0.79% 13 0.49% P = 0.864
One technical problem only 27 21.43% 304 11.43% P < 0.001
Two technical problems 11 8.73% 74 2.78% P < 0.001
Need to use alternative approach 18 14.329% 43 1.62% P < 0.001
Use of additional tools
Evolution (old and new) or TightRail sheaths 3 2.38% 30 1.13% P = 0.396
Metal sheaths 9 7.14% 183 6.88% P = 0.947
Lasso catheter/snare 15 11.90% 86 3.23% P < 0.001
Loop formed with catheter guide wire and lasso 3 2.38% 47 1.77% P = 0.870
Temporary pacing during procedure 21 16.70% 267 10.04% P = 0.025

CS coronary sinus, HV high voltage, ICD implantable cardioverter defibrillator, LV left ventricle, TLE transvenous lead extraction.