Table 1.
The groups of bicycle infrastructure evaluated, sorted from west to east.
Treatment infrastructure group name (abbreviation) | Treatment infrastructure section name (abbreviation) | Type | Neighborhood | Length (mi) | Date opened | For further information |
---|---|---|---|---|---|---|
Atlanta BeltLine Westside Traila & Proctor Creek Greenway (WST-PCG) | Atlanta BeltLine Westside Trail (WST) | Off-street paved trail | Adair Park to Washington Park | 2.41 | 2017–09-29 | Atlanta Beltline 2017 Annual Report, p. 2569; City of Atlanta 2017 Annual Bicycle Report, p. 728 |
Proctor Creek Greenway (PCG) | Off-street paved trail | Bankhead / Grove Park | 2.45 | 2018–05-07 | Atlanta Beltline 2018 Annual Report, p. 3168; City of Atlanta 2018 Annual Bicycle Report, p. 1629 | |
Luckie St & PATH Parkway & Ivan Allen PATHb (LS-TECH-IAP) | Luckie St NW (LS)b | Protected bike lane | Downtown Atlanta | 0.82 | 2017–06-01 | Kahn, 201770 |
Georgia Tech PATH Parkway (TECH)b | Off-street paved trail | Marietta St Artery / Georgia Tech | 0.65 | 2017–11-28 | City of Atlanta 2017 Annual Bicycle Report, p. 828; PATH Foundation71 | |
Ivan Allen PATH (IAP) | Off-street paved trail | Downtown / Vine City | 0.66 | 2018–02-01 | City of Atlanta 2018 Annual Bicycle Report, p. 1529 | |
Atlanta BeltLine Eastside Extension (EST-EXT) | Atlanta BeltLine Eastside Trail: Krog St. NE to BeltLine corridor via Wylie St SE (EST-EXT1) | Off-street paved trail | Reynoldstown | 0.36 | 2017–09-01 | Atlanta Beltline 2017 Annual Report, p. 2969; Atlanta Beltline 2018 Annual Report, p. 2868 |
Atlanta BeltLine Eastside Trail: Irwin St NE to Edgewood Ave NE (EST-EXT 2) | Off-street paved trail | Inman Park | 0.23 | 2017–10-23 | ||
Atlanta BeltLine Eastside Trail: Wylie St SE to Kirkwood Ave SE via BeltLine corridor (EST-EXT3) | Off-street paved trail | Reynoldstown | 0.16 | 2017–10-23 | ||
South Peachtree Creek Trail (PCT) | South Peachtree Creek Trail: Mason Mill Park to N. Druid Hills Rd. (PCT1) | Off-street paved trail | North Decatur | 0.87 | 2017–06-24 | Williams, 201772; 201873 |
South Peachtree Creek Trail: Starvine Way to Clairmont Road underpass (PCT2) | Off-street paved trail | North Decatur | 0.22 | 2018–04-20 | ||
North McDonough St (MCD) | North McDonough St (MCD) | Protected bike lane | Downton Decatur | 0.25 | 2017–09-01 | Banks, 201774 |
The length does not include the unpaved part in the corridor between Lawton St SW. and Ralph David Abernathy Blvd SW.
Between Merrits Ave NW and North Ave NW, this protected bike lane is entirely off the street and could be called an off-street paved trail along that stretch. Conversely, because the PATH Parkway runs adjacent and parallel to a street (Tech Parkway NW), it could be called a protected bike lane rather than off-street paved trail.