Skip to main content
. 2022 Jun 14;2022:9666827. doi: 10.1155/2022/9666827

Table 1.

Process plan comparison.

Performance parameter Original plan Scheme 1 Scheme 2 Scheme 3
Melting temperature (°C) 240 240 240 210
Mold temperature (°C) 90 90 90 90
Injection time (s) 4 4 4 4
Injection + holding pressure + cooling time (s) 48 48 48 42
Maximum holding pressure (MPa) 80 100 100 80
Holding time (s) 20 20 25 20
Warpage (mm) 0.373 0.209 0.199 0.405
Sink mark (mm) 0.186 0.077 0.078 0.176
Scheme variables Increase the holding pressure Pressurize, extend the holding time Reduce melt and mold temperature