Table 2. Comparison Result of the Proposed Method and Clarkson’s Method.
proposed method |
Clarkson’s method |
||||
---|---|---|---|---|---|
parameters | actual value | evaluated value | relative deviation (%) | evaluated value | relative deviation (%) |
Ah, 104 m3 | 2280.00 | 2302.90 | –1.00 | 2744.99 | 20.39 |
A, km2 | 0.6000 | 0.6060 | –1.00 | 0.7224 | 20.40 |
Gm, 104 m3 | 18583.93 | 18770.57 | –1.00 | 27735.27 | 49.24 |
Gf, 104 m3 | 822.75 | 831.02 | –1.01 | ||
Ga, 104 m3 | 5993.94 | 6054.14 | –1.00 | 7216.35 | 20.39 |
Gd, 104 m3 | 8888.91 | 8978.18 | –1.00 | ||
G, 104 m3 | 34289.52 | 34633.9 | –1.00 | 34951.61 | 1.93 |