Table 2.
RM | Controls | Significance Test a | Estimated Effect Size (z cc) b | B-H Adjusted p’c | |||
---|---|---|---|---|---|---|---|
Mean | SD | t | p | ||||
Percentage Correct (%) | |||||||
Multiplication | 68.75 | 91.25 | 5.86 | −3.737 | 0.0008 | −3.840 | 0.003 |
Multiplication Control | 93.75 | 97.57 | 2.37 | −1.569 | 0.068 | −1.612 | 0.090 |
Subtraction | 57.50 | 78.40 | 10.80 | −1.873 | 0.039 | −1.924 | 0.078 |
Subtraction Control | 96.25 | 97.01 | 2.92 | −0.253 | 0.402 | −0.260 | 0.402 |
Mean Reaction Time (s) | |||||||
Multiplication | 2.815 | 1.63 | 0.30 | 3.867 | 0.0006 | 3.973 | 0.002 |
Multiplication Control | 1.611 | 1.30 | 0.18 | 1.652 | 0.058 | 1.697 | 0.117 |
Subtraction | 2.810 | 2.26 | 0.36 | 1.494 | 0.077 | 1.535 | 0.102 |
Subtraction Control | 1.712 | 1.47 | 0.23 | 1.029 | 0.159 | 1.057 | 0.159 |