Skip to main content
. 2022 Jun 26;55(6):153. doi: 10.1617/s11527-022-01992-y

Fig. 2.

Fig. 2

Bulk resistivity of the concrete specimens after 91 days of curing in the moist room compared with corresponding mixtures using similar materials cured for 28 days in the moist room [15]