Skip to main content
. 2022 Mar 21;49(9):3098–3118. doi: 10.1007/s00259-022-05746-4

Fig. 3.

Fig. 3

Images from Mehranian et al. comparing reference thirty minute maximum a posteriori expectation maximisation reconstruction with a 2-min reconstruction with FBSEM-Net using PET and MR inputs (FBSEM-pm), standard data consistency-based reconstructions (MAPEM) and deep learning-based post-processing with PET and MR inputs (Unet-pm) (images from [68])