Fig. 14.

Fig. 14

(Left) Digging a trench to protect the sub-sea cable from ice scour and disturbance at the shoreline. A channel was dug during lowest neap tide. (Right) installation of the inductive cable to the mooring position (1 km off coast) and deployment of the mooring with a small support vessel.