Skip to main content
. Author manuscript; available in PMC: 2022 Jul 8.
Published in final edited form as: J Stat Plan Inference. 2021 Jun 5;216:70–94. doi: 10.1016/j.jspi.2021.05.008

Table 1.

Comparison of the runtime for different methods to construct SCBs. The reported runtime is the average over 1000 calls to construct a SCB for a sample of size N = 50 from Model A in 1D and Model C in 2D.

tGKF ffscb Boots-t gMult-t rMult-t
Model A (1D) 4.2 s 115.2 s 88.4 s 86.6 s 83.9 s
Model C (2D) 92.8 s - 2039.6 s 1858.4 s 1864.9 s