Skip to main content
. 2022 Jul 4;22(13):5034. doi: 10.3390/s22135034

Figure 5.

Figure 5

The transmission line and the three towers, with the sensors installed. The transmission line transports the energy generated by the Ternium Steel Co. thermoelectric plant to the Furnas National Grid Substation.