Skip to main content
. 2021 Mar 9;42(6):1306–1324. doi: 10.1111/risa.13711

Table I.

TPD BN Model Nodes, States, Pre‐ and Postintervention Probabilities, and Node Types

Node Node State Preintervention Probability [%] Postintervention Probability [%] Node Type
Z1: Third‐Party Excavator Property Owner 19.41 19.41
ZC
Contractor 74.81 74.81
Government Entity 5.78 5.78
Z2: Potholing Performed? Yes 22.07 100.00
X
No 77.93 0.00
Z3: Other Excavation Best Practices Performed? Yes 71.60 71.60
ZC
No 28.40 28.40
Z4: Sufficient Excavation Practices? Yes 54.57 94.30
ZC,ZM
No 45.43 5.70
Z5: Sufficient L&M Practices? Yes 87.66 87.66
ZS
No 12.34 12.34
Z6: Sufficient Notification Practices? Yes 54.54 53.02
ZC
No 45.46 46.98
Z7: Sufficient Preventive Measures? Yes 77.17 78.35
Y
No 22.83 21.65