Skip to main content
. 2022 Jul 18;12:12262. doi: 10.1038/s41598-022-16388-9

Figure 5.

Figure 5

Runtime and losses of the multi-model training. Shown are the number of finished runs (left) and the corresponding losses (right) achieved within a total wall clock time of 21:12 hours using parallel workers. The plots are based on the hpbandster.visualization python package26.