TABLE 2.
The commonalities between our prior and our new progress indication methods.
| Commonality |
|---|
| The validation curve is regarded as the sum of some zero-mean random noise and a smooth trend curve |
| An inverse power function is used to estimate the trend curve |
| The approach to conduct Monte Carlo simulation to estimate the count of original validation points required to train the model |
| The approach to monitor the present model construction speed |
| The approach to estimate the model construction time left based upon the projected model construction cost left and the present model construction speed |