Skip to main content
. 2020 Jan 29;12(e2):e264–e270. doi: 10.1136/bmjspcare-2019-002037

Table 5.

Complete response and total control over multiple cycles in the acute (0–24 hours) and delayed (24–120 hours) and overall phases (0–120 hours)

Acute (0–24 hours), % Delay (24–120 hours), % Overall (0–120 hours), %
NEPA (%) Historical controls, APR (%) NEPA (%) Historical controls, APR (%) NEPA (%) Historical controls, APR (%)
Complete response
 Cycle 1 70.0 72.1 85.7 64.4 60.0 46.8
 Cycle 2 85.0 91.7 92.2 65.5 78.3 66.7
 Cycle 3 88.3 90.0 98.1 68.5 86.7 68.3
 Cycle 4 88.3 89.8 98.1 66.0 86.7 71.2
Complete protection
 Cycle 1 66.7 67.2 85.0 56.1 56.7 38.7
 Cycle 2 85.0 83.3 90.2 68.0 76.7 63.3
 Cycle 3 86.7 81.7 94.2 69.4 81.7 61.7
 Cycle 4 88.3 78.0 92.4 73.9 81.7 67.8
Total control
 Cycle 1 63.3 54.1 76.3 45.5 48.3 25.8
 Cycle 2 81.7 73.3 79.6 54.5 65.0 45.0
 Cycle 3 80.0 66.7 91.7 62.5 73.3 43.3
 Cycle 4 86.7 71.2 86.5 66.7 75.0 52.5