Skip to main content
. 2022 Jul 30;2022:1149657. doi: 10.1155/2022/1149657

Table 1.

Parameters and descriptions.

Parameter Description
R Set of facility resources
I Set of operations
P Set of personnel resources
D Set of day surgery types
Set of jobs
R i Set of facility resources used by the operation i, iI
t i dp r The processing time of the operation i under resource Rir
t i s The setup time of operation iI
t i c The cleanup time of operation iI
b i The maximum waiting time allowed for operation iI  before it is moved to the next stage
e r The available starting time of the resource rRi
f r The available ending time of the resource rRi
H Huge number
α Very small weight factor
τ Dummy operation of zero duration, τ  is after all operations
J i Job to which operation iI  belongs to
i dp Operation i  processed by surgeon  p, belonging to type d of surgery dD,  pP

Decision variables

zJir=1,if resource r is assigned to operation i of the day surgery J0,otherwise,iI,rRi
θJru=1, if resource r is assigned to day surgery J before the resource u0,otherwise,r,uRi,r<u,J
yJQr=1,if surgery J is scheduled before surgery Q on the shared resource r0,otherwise,J,Q,J<Q,rR
x J i r Starting time of operation i of the day surgery J under resource r
L J i r Leaving time of operation i of the day surgery J under resource r
x τ Starting time of dummy operation τ