SITE | N | % REFERRED |
---|---|---|
RC 1, Site 1 (E) | 170 | 57.1 |
RC 1, Site 2 (C) | 319 | 22.9 |
RC 1, Site 3 (E) | 233 | 22.3 |
RC 1, Site 4 (C) | 262 | 31.3 |
RC 2, Site 1 (E) | 197 | 70.6 |
RC 2, Site 2 (C) | 188 | 68.1 |
RC 2, Site 3 (E) | 205 | 62.0 |
RC 2, Site 4 (C) | 183 | 86.9 |
RC 3, Site 1 (E) | 89 | 56.2 |
RC 3, Site 2 (C) | 315 | 35.9 |
RC 3, Site 3 (E) | 680 | 28.5 |
RC 3, Site 4 (C) | 287 | 9.4 |
RC 3, Site 5 (E) | 120 | 43.3 |
RC 3, Site 6 (C) | 69 | 15.9 |
RC 4, Site 1 (E) | 1177 | 24.7 |
RC 4, Site 2 (C) | 780 | 34.9 |
RC 4, Site 3 (E) | 826 | 13.1 |
RC 4, Site 4 (C) | 224 | 37.5 |
RC 4, Site 5 (E) | 1853 | 4.5 |
RC 4, Site 6 (C) | 1160 | 55.5 |
RC 5, Site 1 (E) | 852 | 19.6 |
RC 5, Site 2 (C) | 995 | 12.3 |
RC 5, Site 3 (E) | 559 | 11.4 |
RC 5, Site 4 (C) | 1297 | 14.8 |
RC 6, Site 1 (E) | 138 | 37.7 |
RC 6, Site 2 (C) | 303 | 31.7 |
RC 6, Site 3 (E) | 107 | 51.4 |
RC 6, Site 4 (C) | 199 | 20.6 |
RC 6, Site 5 (E) | 77 | 58.4 |
RC 6, Site 6 (C) | 148 | 29.1 |
Chi-square= 2526.13, df=30, p< .001