Skip to main content
. 2022 Aug 22;12:14293. doi: 10.1038/s41598-022-16773-4

Table 10.

Secondary potential scenario from the BLEVE.

Main scenario Vector Secondary potential scenario
BLEVE Overpressure

Flash fire

Pool fire

Jet fire

Fire ball

Vapour cloud explosion, (VCE)

BLEVE

Toxic release