Skip to main content
. 2022 Aug 11;25(9):104906. doi: 10.1016/j.isci.2022.104906

Table 1.

Techno-economic assumptions for electricity technologies

Economic parameter Solar PV Wind Combined-cycle gas turbine Utility-battery storage
Fixed capital cost ($/kWe) 1248 (U.S. EIA, 2021b) 1846 (U.S. EIA, 2021b) 957 (U.S. EIA, 2021b) 307 ($/kWhe) (U.S. EIA, 2021b)
Fixed O&M cost ($/yr.kWe) 15.33(U.S. EIA, 2021b) 26.47 (U.S. EIA, 2021b) 12.26 (U.S. EIA, 2021b) 24.93 (U.S. EIA, 2021b)
Lifetime (yr) 25 (IEA, 2020) 25 (IEA, 2020) 30 (IEA, 2020) 10 (IEA, 2020)
Heat rate (Btu/kWh) 6370 (U.S. EIA, 2021b)
Fixed hourly costa($/h.kWe) 0.0139 0.0210 0.0102 0.0078 ($/h.kWhe)
Relative efficiency 54% 90% round-trip (Lazard, 2019)
Variable O&M cost ($/kWhe) 0 0 0.0019 0 (captured in fixed O&M)
Variable fuel costb($/kWhe) 0.0191 (U.S. EIA, 2021b)
Total variable costc($/kWhe) 0 0 0.0210 0
a

Calculations are based on our assumed discount rate of 7%.

b

The variable fuel cost for the combined-cycle plant was based on $3/MMBtu natural gas.

c

Calculations are based on the variable O&M and variable fuel cost.