Skip to main content
. 2022 Sep 1;6:40. doi: 10.1038/s41538-022-00154-2

Table 7.

Included cost items in the monitoring cost calculation.

Description of cost items Variable Value Unit Reference
Labor costs of collecting 100 samples per batcha Ccolle 1000 euro/batch 27
Costs of analysing one aggregate sample from one batchb Canaly 100 euro/batch 27
Costs of storage Cstor 96 euro/batch 27
Costs of recall Crecall 5800 euro/batch 28
Percentage feed recalled Precall 60 % 28
Costs of destruction Cdestr 500 euro/batch 28
Costs of replacement Cprice 22000 euro/batch 28
Costs of disease burden Cburden 30987 euro/batch 26

aHere we assumed 100 tonnes per feed batch; 100 incremental samples were collected per batch and combined into one aggregate sample.

bOne aliquot was extracted from the aggregate sample to determine the AFB1 concentration using liquid chromatography combined with mass spectrometry (LC-MS/MS) with a detection limit of 0.0125 µg/kg.