Table 4.
Input parameters of benefits and costs (B/C) analysis.
| Scenario | Mitigation options | Mitigation cost (USD/tonneCO2e) |
|---|---|---|
| Scenario 1 | On-site Recycling | 0.00 |
| Composting | 32.00 | |
| Scenario 2 | Composting (off-site) | 32.00 |
| Off-site recycling | 5.57 | |
| RDF | 50.30 | |
| Scenario 3 | On-site Recycling | 0.00 |
| Composting (on-site) | 32.00 | |
| Off-site recycling | 5.57 | |
| Composting (off-site) | 32.00 | |
| RDF | 50.30 |