Skip to main content
. 2022 Aug 22;10:955427. doi: 10.3389/fpubh.2022.955427

Table 5.

NRI and IDI of the prognostic nomogram for POSNs patients with DM compared with TNM staging system.

Index Training set Validation set
Estimate 95%CI p–value Estimate 95%CI p–value
NRI (vs. AJCC TNM staging)
For 24–month OS 0.689 0.335–0.946 <0.001 0.537 0.161–0.912 <0.001
For 36–month OS 0.472 0.120–0.671 <0.001 0.603 0.362–0.843 <0.001
For 48–month OS 0.253 0.059–0.546 <0.001 0.598 0.381–0.812 <0.001
IDI (vs. AJCC TNM staging)
For 24–month OS 0.221 0.174–0.268 <0.001 0.336 0.270–0.402 <0.001
For 36–month OS 0.197 0.155–0.239 <0.001 0.310 0.250–0.370 <0.001
For 48–month OS 0.180 0.141–0.219 <0.001 0.290 0.235–0.345 <0.001