Skip to main content
. 2022 Sep 10;8:203. doi: 10.1186/s40814-022-01161-6

Table 8.

EQ-5D-5L utilities and MRB-QoL total burden score, by time point and group

Intervention Control Difference (95% CI)
Missing
n (%)
Floor effects
n (%)
Ceiling effects
n (%)
Mean
(95% CI)
Missing
n (%)
Floor effects
n (%)
Ceiling effects
n (%)
Mean (95% CI)
EQ-5D-5L
Baseline 2 (5.4) - 6 (20.0) 0.74 (0.64, 0.83) 1 (3.3) - 8 (21.6) 0.73 (0.65, 0.82) 0.01 (−0.11, 0.13)
nI = 37
nC = 30
6 months 0 (0) - 4 (15.4) 0.75 (0.67, 0.83) 0 (0) - 5 (23.8) 0.74 (0.63, 0.84) 0.02 (−0.11, 0.14)
nI = 26
nC = 21
9 months 1 (4.0) - - 0.72 (0.61, 0.83) 0 (0) - - 0.77 (0.68, 0.86) −0.05 (−0.19, 0.08)
nI = 25
nC = 22
MRB-QoL
Baseline 5 (13.5) - 2 (5.4) 23.79 (18.23, 29.35) 4 (13.3) - 3 (10.0) 26.52 (18.75, 33.30) −2.73 (−11.85, 6.39)
nI = 37
nC = 30
6 months 3 (11.5) - 2 (7.7) 21.49 (15.12, 27.87) 7 (33.3) - 2 (9.5) 24.71 (12.82, 36.61) −3.22 (−15.02, 8.59)
nI = 26
nC = 21
9 months 2 (8.0) - 2 (8.0) 22.44 (15.24, 29.64) 4 (18.2) - 4 (18.2) 25.27 (15.40, 35.13) −2.83 (−14.35, 8.70)
nI = 25
nC = 22

nI, nC number of patients in intervention (I) and control (C) after withdrawals, CI confidence intervals