Skip to main content
. 2022 Aug 28;8(9):e10365. doi: 10.1016/j.heliyon.2022.e10365

Table 6.

Thermocycler PCR program.

PCR Cycling Conditions
Steps Temperature Time Cycles
Initial denaturation 95 °C 3 min 1
Denaturation 94 °C 15 s 30–35 cycles
Annealing 56–60 °C 30 s
Extension 72 °C 30 s
Final extension 72 °C 10 min 1
Hold 4 °C