Table 4.

Seven implementing scenarios of LID practices.

LID practice Installing site Installing ratio (%) Installing dimensions (m2) Soil layer porosity (%) Soil layer hydraulic conductivity (m/d) Storage layer thickness/barrel height (mm) Storage layer clogging factor (%) Drain delay (hr) Reference
IT Roadside 15 11,224 50 0.3. 450 0 n.a. [22,59]
RBa Building 15 13,469 n.a. n.a. 680 n.a.b 6 [22,61]
PP Parking lot and square 15 6734 50 0.3 300 0 n.a. [22,24,60]
IT ​+ ​RB Roadside and Building 15 ​+ ​15 11,224 ​+ ​13,469
IT ​+ ​PP Roadside and Parking lot and Square 15 ​+ ​15 11,224 ​+ ​6734
PP ​+ ​RB Building and Parking lot and Square 15 ​+ ​15 13,469 ​+ ​6734
IT ​+ ​PP ​+ ​RB Roadside and Building and Parking lot and Square 15 ​+ ​15 +15 11,224 ​+ ​13,469 ​+ ​6734
a

One rain barrel with a volume of 208 ​L (height: 680 ​mm, diameter: 625 ​mm) is designed to collect runoff from 100 ​m2 of private building roof, and the drain delay time was set as 6 ​h according to technical manual [22].

b

n.a.: not applicable.