Skip to main content
. 2022 Sep 7;10(37):12433–12447. doi: 10.1021/acssuschemeng.2c04095

Table 3. Kinetics Modeling Parameters of CV Dye Sorption onto MPBC Sorbent.

Kinetic models Results
PFORE k1 (min–1) 0.04
  qe (mg g–1) 7.49
  R2 0.98
PSORE k2 (g mg–1 min) 0.01
  qe (mg g–1) 11.66
  R2 0.99
IPDE (Step I from 1 to 10 min) ki (mg g–1 min0.5) 2.72
  X (mg g–1) –1.66
  R2 0.95
IPDE (Step I from 10 to 60 min) ki (mg g–1 min0.5) 0.81
  X (mg g–1) 4.58
  R2 0.96
IPDE Step III from (60 to 180 min) ki (mg g–1 min0.5) 0.03
  X (mg g–1) 10.60
  R2 0.85
Elovich equation α (mg g–1 min–1) 4.62
  β (g mg–1) 0.50
  R2 0.95