Table 4.
Calculation of scratch closing area and percentage of growth at 0, 2, 8, and 24 h after treatment.
| Time (h) | Area | Percent of growth | ||
|---|---|---|---|---|
| Extract | Blank | Extract | Blank | |
| 0 | 630.5 | 857.24 | 7.88% | 18.37% |
| 2 | 584.4 | 699.75 | ||
| 89.43% | 23.23% | |||
| 8 | 61.75 | 537.18 | ||
| 53.457% | 45.76% | |||
| 24 | 28.74 | 291.34 | ||
Percent of growth = −(T2 scratch area − T1 scratch area)/T1 scratch area × 100.