Table 8.
ZOGP model formulation of the NIoMT platform
| ZOGP model formulation | Goal |
|---|---|
| : Satisfy five mandated resource limitations for the national IoMT platform strategy | |
| : Select the highest weights for the national IoMT platform strategy from the ANP results | |
| : Use the targeted total cost of 45 million for the IoMT infrastructure in the national IoMT platform strategy selection | |
| Subject to | |
| Avoid over-utilizing the maximum system construction cost (NT$) (× NT$10,000) | |
| Avoid over-utilizing the maximum consultant fee (NT $) (× NT $10,000) | |
| Avoid over-utilizing the maximum total cost of the IoMT infrastructure (NT $) (× NT $10,000) | |
| Avoid over-utilizing the maximum reduction rate of medical staff demand (%) | |
| Avoid over-utilizing the maximum improvement rate of the diagnosis efficiency (%) | |
| Select four national IoMT platform strategies | |
| Avoid the over- or under-expected targeted total cost of the IoMT infrastructure |