Average time to first EMS vehicle on the scene and overall duration of the missions.

Time to First Vehicle on the Scene
(min)
Duration of the Missions
(min)
2019 2020 2021 2019 2020 2021
January 13.6 13.3 15.5 61.0 58.6 66.0
February 12.0 12.9 14.3 55.1 55.5 62.5
March 12.1 17.8 15.4 56.3 73.9 64.4
April 12.1 15.0 15.1 59.0 68.8 66.1
May 12.8 14.8 15.0 58.3 64.8 61.7
June 12.5 14.5 13.7 56.2 62.4 58.9
July 12.7 15.2 14.8 54.3 61.2 60.8
August 13.2 14.6 14.0 57.2 64.1 62.2
September 12.4 13.9 14.1 57.4 59.8 63.4
October 12.5 15.9 13.8 59.0 63.2 60.4
November 12.7 15.7 14.0 59.9 74.6 62.5
December 13.3 15.8 15.6 59.0 68.9 67.0
12.7 ± 0.3 15.0 ± 1.3 * 14.6 ± 0.7 * 57.7 ± 2.0 64.7 ± 5.9 * 63.1 ± 2.3 *

* t-test for paired data, p < 0.05.