Skip to main content
. 2022 Sep 26;56(20):14387–14396. doi: 10.1021/acs.est.2c02261

Table 2. Means and Standard Deviations of the Retardation Time Estimated Using the Pesticide Detection and Exceedance Frequenciesa.

  detection (year)
exceedance (year)
  total sand clay total sand clay
A 3 ± 1 (0.58) 2 ± 1 (0.67) 34 ± 3 (0.74) 9 ± 1 (0.63) 9 ± 1 (0.62)  
S 13 ± 2 (0.41) 11 ± 1 (0.61) 35 ± 3 (0.74) 12 ± 1 (0.52)    
DEA 14 ± 1 (0.62) 10 ± 1 (0.71) 33 ± 5 (0.77)   1 ±1 (0.44) 24 ± 3 (0.44)
DIA 15 ± 1 (0.66) 12 ± 1 (0.55) 9 ± 1 (0.40) 19 ± 1 (0.53) 9 ± 1 (0.44) 21 ± 3 (0.61)
DEIA 7 ± 1 (0.47) 1 ± 2 (0.76) 22 ± 1 (0.78) 14 ± 1 (0.53) 11 ± 3 (0.47) 33 ± 3 (0.73)
BAM       3 ± 4 (0.51) 5 ± 1 (0.46)  
B –1 ± 1 (0.65)   –2 ± 1 (0.68)      
a

The means of the correlation coefficients between the pesticide sales and frequencies are shown in the parenthesis.