Table 3.
Review of some studies using ERT to characterize mining wastes and storage facilities
References | Country | TSF / WRP | ERT setup | Remarks |
---|---|---|---|---|
Poisson et al. (2009) |
Canada Quebec |
WRP |
pseudo-3D ERT 36m x 30m |
Identification of fine-grained and coarse-grained layers Validation with two trenches |
Anterrieu et al. (2010) |
Canada Quebec |
WRP |
2D ERT lines (x12) 26m to 160m |
Large-scale internal structure of WRP from ERT inversions History of WRP construction |
Martinez et al. (2014) |
Spain Andalucia |
TSF |
2D ERT lines (x2) 400m to 480m |
Large-scale internal structure of TSF and assessment of environmental risk |
Booterbaugh et al. (2015) |
Canada Alberta |
TSF |
2D ERT lines (x3) 600m to 800m |
Comparison of TL-ERT with direct measurements of water content and EC Identification of water table |
Martínez et al. (2016) |
Spain Andalucia |
TSF |
2D ERT line 290m |
Combined ERT and hydrogeochemical internal characterization of TSF |
Epov et al. (2017) |
Russia Kemerovo |
TSF |
2D ERT lines (x3) 235m |
Mapping of reactive tailings Relationship between - , sulfide content and TDS |
Greer et al. (2017) |
United States Virginia |
WRP Valley fill |
2D TL-ERT lines 90m to 315m |
TL-monitoring of water infiltration (artificial event) Hydrogeological behavior |
Yurkevich et al. (2017) |
Russia Kemerovo |
TSF |
2D ERT lines (x6) 14m to 33m |
Delineation of oxidized tailings with ERT - pH relationship |
Martín-Crespo et al. (2018) |
Spain Murcia |
TSF |
2D ERT lines (x6) 165m to 260m |
TSF history and tailing volumes estimated from ERT and aerial photogrammetry |
Power et al. (2018) |
Canada Nova-Scotia |
WRP |
2D ERT lines (x7) 140m to 365m pseudo-3D ERT 140m x 80m |
Internal composition of WRP Validation with logging Delineation of AMD and future sources of AMD |
Hester et al. (2019) |
United States Virginia |
WRP Valley fill |
2D TL-ERT lines 45m to 422m |
TL-monitoring of water infiltration (artificial event) Hydrogeological behavior |
Martín-Crespo et al. (2019) | Spain | TSF |
Multiple 2D ERT 45m to 500m |
Review of ERT imaging for 7 abandoned TSF in Spain |
Vásconez-Maza et al. (2019) |
Spain Murcia |
WRP/TSF |
2D ERT lines (x4) 90m to 215m |
Prediction of Chromium content from values with - Cr in-situ relationship |
Gabarrón et al. (2020) |
Spain Murcia |
TSF |
2D ERT lines (x7) 10m to 180m |
Systematic sampling and high-resolution ERT to assess various relationships |
Canales et al. (2020) |
Australia South Australia |
TSF |
2D ERT line 410m |
Sampling of tailings to assess petrophysical relationship with fluid EC and saturation |
Vásconez-Maza et al. (2020) |
Spain Murcia |
WRP/TSF |
2D ERT lines (x8) 90m to 215m |
Classification of wastes with PCA (Principal Component Analysis) of ERT results |