Table 1.
Comparison between FPV system and Balbina Hydropower
| Electricity generation technology | Average annual energy generation (MWh)/1 MW installed | Annual Energy generated/area occupied | Capacity factor |
|---|---|---|---|
| FPV plant | 1,408 | 133.9 kWh/m2 | 16.1% |
| Balbina Hydropower | 4,048 | 0.37 kWh/m2 | 46.2% |