Skip to main content
. Author manuscript; available in PMC: 2023 Jan 15.
Published in final edited form as: J Hazard Mater. 2021 Aug 5;422:126832. doi: 10.1016/j.jhazmat.2021.126832

Figure 1.

Figure 1.

Schematic of building intrusion pathways for CIPP waste products from a sewer liner manufacturing worksite. The CIPP worksite includes a pressure source at the truck, uncured resin tube, exhaust pipe, and the escape of exhaust and fugitive emissions into the air.