Table 2.
Component | Definition |
---|---|
Number of sterilization cycles per procedure | • Mean number or sterilization cycles required per procedure |
Set processing time in the OR |
Consists of the following: • Time taken to prepare (opening the set, preparing operating table and checking implants) • Time taken to clean and remove systems in the OR (from removal of first implant from the OR to removal of all contaminated sets) • Time taken to record implants used per procedure • Time taken to replenish implants missing in the set |
Set processing time in the sterilization department |
Consists of the following: • Time taken to wash all instruments and implants per set per procedure • Time taken to assemble cleaning baskets per set per procedure • Time taken for quality inspections before and after mechanical cleaning and assembly of the containers for sterilization per set per procedure |
Set processing time in the purchasing department |
Consists of the following: • Time taken for validation and coding of the implants used per procedure • Time taken for registration and re-coding time of the implants used per procedure • Time taken to place an implant order per procedure • Time taken to receive and reconciliate implants • Time taken for manual error correction per procedure |
Overall set processing time | • Sum of set processing time in the OR, sterilization department and purchasing department |
Number of missing or damaged implants per procedure | • Total number or implants unavailable or damaged per procedure |
Number of baskets used per procedure | • Number of baskets placed into the cleaning machine per procedure per cycle |
Number of cleaning cycles per procedure | • Mean number of cleaning cycles required per procedure |
Number of containers entering autoclave | • Mean number of containers entering the autoclave per procedure per cycle |
Total set processing costs |
Calculations based on the following: • Each cycle (washing, sterilization and consumables) costs €18 (USD$19) • Time costs calculated by costs of relevant workforce per time multiplied by average processing times • Total cost calculated by the sum of the cost of cycles, cost of washing and sterilization time, cost of OR time and cost of purchasing department time |
Water consumption and cost |
Calculations based on the following: • A water consumption of 60 L per cycle for the cleaning machine and 240 L per cycle for the autoclave • Water consumption calculated as number of cleaning machine cycles multiplied by 60, plus the number of autoclave cycles multiplied by 240 • Costs were based on an average price of water for domestic use in Spain of 1.90 €/m3 (USD$2), as reported in the Asociación Española de Abastecimientos de Agua y Saneamiento—Asociación Española de Empresas Gestoras de los Servicios de Agua Urbana (AEAS-AGA) 2020 tariff survey(17) |
Electricity consumption and cost |
Calculations based on the following: • An electricity consumption of 0.41 kW per cycle for the cleaning machine and 5 kW per cycle for the autoclave • Electricity consumption calculated as number of cleaning machine cycles multiplied by 0.41, plus the number of autoclave cycles multiplied by 5 • Costs were based on an average price of €0.1214 (USD$0.1279) per kWh, as reported by FACUA in 2020(18) |
Staff satisfaction |
• Improvement by changing process assessed using a questionnaire • NASA-TLX used to assess staff with physically demanding work |