Skip to main content
. 2021 Oct 13;10(4):1619–1650. doi: 10.1007/s40072-021-00214-w

Fig. 3.

Fig. 3

Cost of methods in total number of degrees of freedom (vertical axis) versus maximum level L (horizontal axis), when using the number of quadrature points (27) (left) and (28) (right) with N1=10. graphic file with name 40072_2021_214_Figa_HTML.jpg shows the cost of the quadrature, graphic file with name 40072_2021_214_Figb_HTML.jpg the cost of the FEM-BEM discretisation, graphic file with name 40072_2021_214_Figc_HTML.jpg the resulting cost of the single-level and graphic file with name 40072_2021_214_Figd_HTML.jpg of the multilevel methods