Table 4.
Spearman correlation coefficients for the strength of association between injury & illness rates and OHSMS programming level revised OSHA Form 33 completion rates P50% (n = 7).
| OHSMS element | TRC | DART |
|---|---|---|
|
| ||
| Overall | 0.79* | 0.79* |
| Hazard anticipation and detection | 0.79* | 0.79* |
| Hazard prevention and control | 0.84* | 0.84* |
| Planning and evaluation | 0.65 | 0.65 |
| Administration and supervision | 0.76* | 0.76* |
| Safety and health training | 0.90* | 0.90* |
| Management leadership | 0.91* | 0.91* |
| Employee participation | 0.55 | 0.55 |
OSHA – U.S. Occupational Safety and Health Administration. OHSMS – Occupational Health and Safety Management System. TRC – Total Recordable Case Rate.
DART – Days, Away, Restricted, or Transferred Rate.
Correlation was significant (P < 0.05).