Skip to main content
. 2022 Nov 11;8(11):e11519. doi: 10.1016/j.heliyon.2022.e11519

Table 2.

The staff required to support an array of 10 2.45-GHz MP CVD reactors.

Functionality Total
Operators 4
Senior grower (head of the laboratory) 1
Administrator (supply, external operations) 1
Total 6