Table 4.
Intersection with a traffic light and zebra crossing.
| The main project | Project indicators |
|---|---|
| The crossroads | There are all kinds of tall buildings, all kinds of road signs, trees, guardrails on both sides of the road, streets, sidewalks, and a total of 10 buildings |
| Number of vehicles | Each driving direction has 1 or two vehicles and a total of 12 vehicles |
| The speed of the car | 20 km/h |
| Number of passengers | On both sides of the zebra crossing and about 3-4 people on each side |
| Distractors | Vehicles (cars or buses, or electric cars, or tricycles), pedestrians, and road signs |
| Sound | The sound of car sirens and the noise of people going and going |
| Other interference | None |
| The weather conditions | A sunny day with moderate temperature |