Two consecutive intersections.

The main project Project indicators
At the first crossing The crossroads There are all kinds of tall buildings, all kinds of road signs, trees, guardrails on both sides of the road, streets, sidewalks, buildings all over very dense, and 8 buildings
Number of vehicles Each driving direction has two or three vehicles and a total of 10 vehicles
The speed of the car 20 km/h
Number of passengers On both sides of the crossing and about 5 people are on each side
Distractors Vehicles (cars or buses, or electric cars, or tricycles), pedestrians, and road signs
Sound The sound of car sirens and the noise of people going and going
Other interference Two crossings

At the second crossing The crossroads There are all kinds of tall buildings, all kinds of road signs, trees, guardrails on both sides of the road, streets, sidewalks, very dense buildings, and 12 buildings
Number of vehicles Each driving direction has four vehicles and a total of 16 vehicles
The speed of the car 25 km/h
Number of passengers On both sides of the crossing and about 5-6 people are on each side
Distractors Vehicles (cars or buses, or electric cars, or tricycles), pedestrians, and road signs
Sound The sound of car sirens and the noise of people going and going