List of components and actions needed to build Block 1, Block 2 and EGT, respectively.

Components Actions
Quantity Description Action ID Action Description
Block 1 3 Planet Gear 1 Pick up/Place Carrier
3 Planet Gear Bearing 2 Pick up/Place Gear Bearings (×3)
1 Carrier Shaft 3 Pick up/Place Planet Gears (×3)
1 Carrier 4 Pick up/Place Carrier Shaft
Block 2 1 Ring Bear 5 Pick up/Place Sun Shaft
1 Sun Gear Bearing 6 Pick up/Place Sun Gear
1 Sun Gear 7 Pick up/Place Sun Gear Bearing
1 Sun Shaft 8 Pick up/Place Ring Bear
EGT 1 Block 1 9 Pick up Block 2 and place it on Block 1
1 Block 2 10 Pick up/Place Cover
1 Cover 11 Pick up/Place Screw (×2)
2 Screws 12 Pick up Allen Key, Turn both screws, Return Allen Key and the EGT

First, the assembly of Block 1 (action IDs 1 to 4), then Block 2 (action IDs 5 to 8) and finally the EGT (action IDs 9 to 12).