Skip to main content
. 2022 Nov 23;10:922844. doi: 10.3389/fped.2022.922844

Figure 1.

Figure 1

Fluoroscopy images during the operation. The work tunnel was created transpedicular (A), then the balloon was loaded into the vertebral body (B) after the lesion curettage and inflated simultaneously under fluoroscopic guidance and pressure control (up to 120 psi) (C1,C2). The void was filled with calcium sulfate cement and then the rods were locked (D1,D2).