Table 8.
Operation | Costs of Operation per Piece (EUR) | |||
---|---|---|---|---|
Build Type | Initial Prototype | Optimized Build | SLM | |
Filler material (Hybrid = AlSi5, SLM = Al) |
6 | 6 | 44.7 | |
Shielding gas and Base Preparation | 34.6 | 14 | 220 | |
Welding | CAPP + CAM + Robot Setup | 273 | 148 | – |
CMT MIG-Welding Deposition | 218 | 128 | – | |
Milling | CAM + Robotic Preparation | 313 | 140 | – |
Robotic Milling | 977 | 232 | – | |
SLM | Laser-Melting Fabrication | – | – | 1487.5 |
Total Costs S (EUR) | 1802 | 669 | 1752.2 |