Skip to main content
. 2022 Nov 22;22(23):9046. doi: 10.3390/s22239046

Table 2.

Comparisons between the evaluation metrics of the results of the synopsis of Video2 from (a) the traditional method without tube resizing and (b) the proposed method with dynamic and adaptive online tube resizing.

Methods FCR(%) TC CC
Without resizing 0.96 1.25×1033 24,949
Ours 1.30 8.73×1023 9113