Table 4.
Hypothesis path | Estimates | Bias-corrected 95% CI | Percentile 95% CI | Results | ||
---|---|---|---|---|---|---|
Lower | Upper | Lower | Upper | |||
HEV → TV → UB | 0.2631 | 0.1807 | 0.3543 | 0.1803 | 0.3521 | Supported |
HEV → TEV → UB | 0.0848 | 0.0075 | 0.1717 | 0.0058 | 0.1653 | Supported |
HEV → RV → UB | 0.3817 | 0.3102 | 0.4540 | 0.3093 | 0.4582 | Supported |
HEV → SV → UB | 0.3053 | 0.2192 | 0.3928 | 0.2197 | 0.3933 | Supported |