Table 1. Time required for cost data collection for each input resource.

Input Source Data type Time required for collection
Negotiation & waiting (Days) (Median, Interquartile Range) Actual Collection (Person-days) (Median, Interquartile Range)
Human resource HR Salary & Incentives 12 (7.75–20) 9 (4.5–24)
Leave 3 (2–4.5) 3 (3–5.5)
Time allocation 11.5 (5.5–17) 23 (9–45.0)
Physical area/ Building Building area measurement 3 (2–4.75) 9.5 (4.25–11.5)
Determination of rental price 1 (1–1) 1 (1–1)
Consumables /Drugs Consumables used 5.5 (2.25–15) 8 (3–17)
Prices of consumables 5 (2.25–4.75) 7.5 (3.75–9.25)
Furniture /Non-consumables Furniture items used 5.5 (2–7.75) 9 (6.25–10)
Prices of non-consumable items 3.5 (2.25–5) 5.5 (3.25–9)
Information on average life of furniture items 3 (2–4.75) 3 (2–3)
Equipment Equipment used 5 (2.25–7) 9 (5.25–11.5)
Equipment procurement prices 4.5 (2.25–5) 10 (3.25–13.5)
Average life of equipment 3 (2.25–5) 3.5 (2–10)
Usage of equipment in different procedures 4.5 (3–5) 11 (6.25–13.5)
Overheads Electricity 2.5 (1–8.25) 3.5 (2.25–5)
Building Maintenance 3 (1–8.5) 3.5 (2.25–5)
Equipment Maintenance 3.5 (1–8.75) 3.5 (2.25–5)
Utility Laundry 3 (1–4) 4 (3–4)
Dietetics 5 (1.75–7.25) 4 (2–5)
Biomedical waste management 3 (1–6.25) 3 (2–3.75)
Service provision Annual load data 4.5 (2.5–5.75) 6.5 (4.25–9.75)