Chronological accident description for Unit 1 of the Fukushima Daiichi NPP.

Date Time Event
2011/3/11 14:46 Earthquake: reactor was automatically shut down. Decay heat was continuously generated
Loss of off-site power: diesel generators were automatically started. Therefore, AC and DC power was available in this period
14:52–15:34 IC cooling: reactor was cooled by Isolation Condenser (IC) with start-stop operation so that RPV cooling down rate did not exceed 55 °C/h. Unit 1 was operated to achieve a cold shutdown
15:37 Tsunami hit: AC and DC were lost. IC was not in operation at this time
After tsunami Reactor Pressure Vessel (RPV) water inventory decreases due to no water injection
After 20:00 (PCV) pressure increased
RPV bottom damage: Corium (melted fuel) slumping to PCV pedestal
2011/3/12 14:30 Regarding the containment vessel vent, the operation of AO valve of suppression chamber side was implemented at 10:17 am, and a pressure decrease was confirmed at 2:30 pm
15:36 Reactor building explosions