Skip to main content
. 2022 Dec 5;10:1035212. doi: 10.3389/fpubh.2022.1035212

Table 4.

Implemented preparedness measures for emergency water supply in health care facilities in the literature (N = 10/39).

Implemented measures Number of studies References
Water tanks 6 (15, 29, 34, 39, 40, 47)
Additional pipes 4 (21, 27, 28, 30)
Wells 3 (21, 28, 29)
No reference to implemented preparedness measures 29 All other papers from the literature review