Table 3.
Results of the reliability and convergent validity.
| Variables | Factors | Standard Loadings | Cronbach’s | CR 1 | AVE 2 |
|---|---|---|---|---|---|
| HC | HC1 | 0.877 | 0.71 | 0.873 | 0.775 |
| HC2 | 0.884 | ||||
| VI | VI1 | 0.886 | 0.873 | 0.922 | 0.797 |
| VI2 | 0.892 | ||||
| VI3 | 0.901 | ||||
| PVC | PVC1 | 0.786 | 0.82 | 0.874 | 0.583 |
| PVC2 | 0.792 | ||||
| PVC3 | 0.689 | ||||
| PVC4 | 0.729 | ||||
| PVC5 | 0.813 | ||||
| PVE | PVE1 | 0.901 | 0.816 | 0.891 | 0.733 |
| PVE2 | 0.771 | ||||
| PVE3 | 0.89 | ||||
| PVS | PVS1 | 0.919 | 0.925 | 0.953 | 0.87 |
| PVS2 | 0.953 | ||||
| PVS3 | 0.926 | ||||
| EC | EC1 | 0.883 | 0.834 | 0.901 | 0.751 |
| EC2 | 0.834 | ||||
| EC3 | 0.882 |
1 CR: composite reliability. 2 AVE: average variance extracted.