Skip to main content
. 2022 Dec 16;19(24):16940. doi: 10.3390/ijerph192416940

Table 4.

Estimated results of the spatial econometrics for the digital finance and green development.

Spatial Durbin Model Spatial Error Model Spatial Lag Model
(1) (2) (3) (4) (5) (6)
lndf −0.568 ** −0.400 * −0.581 ** −0.535 ** −0.544 ** −0.568 ***
(0.250) (0.218) (0.232) (0.230) (0.213) (0.213)
W×lndf 0.117 0.132
(0.428) (0.331)
W×lngd 0.211 ** 0.220 *** 0.333 *** 0.337 ***
(0.086) (0.080) (0.072) (0.073)
λ 0.333 *** 0.399 ***
(0.083) (0.083)
X′ control control control control control control
W×X′ control control control control control control
Fixed effect control control control control control control
N 240 240 240 240 240 240
Within R2 0.615 0.670 0.575 0.574 0.570 0.564

* p < 0.1, ** p < 0.05, *** p < 0.01.