Table 2.
A. Mechanical load | |||||||
---|---|---|---|---|---|---|---|
Mesor | |||||||
p | Intercept | Slope | Amplitude | Acrophase | Period | R 2 | |
BMAL1 | <.001 | 1.500 | −0.016 | −0.121 | 22.461 | 21.918 | .951 |
REV‐ERB | <.05 | 1.330 | 0.006 | −0.600 | 20.456 | 20.000 | .461 |
PER2 | <.001 | 1.360 | −0.013 | −0.178 | 20.114 | 22.046 | .897 |
PER3 | <.01 | 1.145 | −0.007 | 0.240 | 28.000 | 25.007 | .731 |
CRY1 | <.05 | 1.402 | −0.012 | −0.152 | 25.743 | 20.000 | .809 |
CRY2 | .32 | 1.278 | −0.010 | 0.086 | 16.331 | 20.000 | .610 |
SOX6 | <.01 | 2.757 | −0.037 | 0.556 | 12.211 | 20.000 | .792 |
SOX9 | <.01 | 3.306 | −0.038 | 1.096 | 10.163 | 22.238 | .670 |
ACAN | <.01 | 2.030 | −0.017 | 0.380 | 11.668 | 21.596 | .758 |
COL2A1 | .09 | 1.165 | −0.003 | −0.313 | 18.668 | 20.000 | .373 |
RUNX2 | .15 | 2.093 | −0.023 | 0.243 | 10.450 | 28.000 | .664 |
B. Nonstimulated (control) | |||||||
---|---|---|---|---|---|---|---|
Mesor | |||||||
p | Intercept | Slope | Amplitude | Acrophase | Period | R 2 | |
BMAL1 | .89 | 1.069 | 0.000 | 0.053 | 8.595 | 28.000 | .065 |
REV‐ERB | .61 | 0.980 | 0.001 | −0.038 | 9.172 | 28.000 | .189 |
PER2 | .91 | 0.944 | 0.001 | 0.026 | 20.138 | 20.000 | .065 |
PER3 | .98 | 1.040 | 0.000 | 0.019 | 16.282 | 21.919 | .020 |
CRY1 | .55 | 1.012 | 0.001 | 0.064 | 15.970 | 21.246 | .250 |
CRY2 | .92 | 1.006 | −0.001 | −0.029 | 17.095 | 20.997 | .074 |
SOX6 | .89 | 1.536 | 0.023 | 0.402 | 11.812 | 28.000 | .574 |
SOX9 | .72 | 0.930 | 0.000 | −0.039 | 10.010 | 28.000 | .141 |
ACAN | .79 | 0.911 | 0.002 | 0.034 | 22.502 | 20.000 | .201 |
COL2A1 | .92 | 1.005 | 0.001 | 0.043 | 17.526 | 21.491 | .053 |
RUNX2 | .77 | 0.862 | 0.003 | −0.033 | 11.199 | 23.373 | .360 |
Note: p, probability value; R 2, coefficient of determination.